OEE and Machine Utilisation Calculator
Enter the shift length, planned and unplanned stops to get machine utilisation and availability. Add the ideal cycle time, total units and good units to get OEE (overall equipment effectiveness) and see where the time went.
The period you are measuring, e.g. one 8-hour shift = 480.
Breaks, meetings, planned maintenance, no orders.
Breakdowns, waiting for material, changeovers.
Formulas used
planned production time = total time − planned stopsrun time = planned production time − unplanned stopsutilisation = run time ÷ total timeavailability = run time ÷ planned production timeperformance = ideal cycle time × total units ÷ run timequality = good units ÷ total unitsOEE = availability × performance × quality
OEE (overall equipment effectiveness) can also be read as ideal cycle time × good units ÷ planned production time. Companies draw the line between planned and unplanned stops differently, so compare figures only when they are measured the same way. Results are rounded for display only; the calculation keeps full precision.
What OEE and utilisation measure
Overall equipment effectiveness (OEE) compares what a machine produced with what it could have produced if it ran all planned time, at its ideal speed, making only good parts. Utilisation is a simpler figure: the share of total time the machine was actually running. They answer different questions.
The three factors
Start from planned production time: the total time minus planned stops such as breaks, team meetings or scheduled maintenance. Availability is run time divided by that planned time, so it falls with breakdowns, material shortages and changeovers. Performance compares the ideal cycle time multiplied by everything made with the actual run time, so it falls when the machine runs slowly or has short stops nobody logs. Quality is good units divided by total units. OEE is the product of all three.
A shift worked through
An 8-hour shift is 480 minutes. Breaks take 60, leaving 420 planned. Breakdowns take 47, leaving 373 minutes of running. The ideal cycle is one unit a minute and 300 units were made, 285 of them good. Availability is 88.8%, performance 80.4%, quality 95%, and OEE is 67.9%. The same result comes from 285 good minutes of ideal output divided by 420 planned minutes.
Where the time went
The loss table splits those 420 minutes into breakdowns, slow running, time spent making bad parts and fully productive time. Seeing minutes rather than percentages makes it easier to decide which loss to attack first.
Reading the results carefully
There is no single target that suits every machine, product mix or industry, so this page does not grade your score. Compare a machine with itself over time, and only with other machines measured under the same rules. Plants differ in what they count as a planned stop, and moving changeovers into planned time can raise OEE without any real improvement. If performance comes out above 100%, the ideal cycle time you entered is too slow.
For output planning, take your OEE into the production capacity calculator.
How to use OEE and Machine Utilisation Calculator
- Enter the total time in minutes and the planned and unplanned stops.
- For OEE, add the ideal cycle time in seconds, the total units made and the good units.
- Read utilisation, availability, performance, quality and OEE, and download the time-loss table.
Privacy: how it works
Calculations run in your browser. The figures you enter are not sent anywhere.
Frequently asked questions
What is the OEE formula?
OEE = availability × performance × quality. Availability = run time ÷ planned production time; performance = ideal cycle time × total units ÷ run time; quality = good units ÷ total units.
What is the difference between utilisation and OEE?
Utilisation only asks how much of the total time the machine was running. OEE also counts slow running and bad parts, and it measures against planned production time instead of total time.
Why is performance above 100%?
The machine made units faster than the ideal cycle time you entered, which is not possible if that time is right. Use the true design speed; otherwise OEE is overstated.