Resource Allocation Calculator
Plan who works on what. Enter each person’s available hours and their weekly hours (or share of time) on each project. The calculator shows everyone’s load, flags anyone booked over 100% and checks each project’s cover against the hours it needs.
Projects
Project 1
Project 2
People
Person 1
Person 2
Used to express each project's hours as full-time equivalents (FTE).
Planning who works on what
Resource allocation is the weekly question every team lead faces: given the people I have, how do I split their time across the work on my plate? A spreadsheet grid of people against projects is the classic answer. This page builds that grid and does the checking for you.
Capacity
Start with each person’s available hours per week. That is not always their contracted hours: subtract regular meetings, support duty or part-time days. A developer on a 40-hour week who spends a day a week on support has about 32 hours for project work.
Allocations
Enter how many hours each person spends on each project, or switch to percentages if your team plans in shares of time. Percentages are converted to hours using each person’s own capacity, so 50% of a 24-hour week is 12 hours.
Reading the results
The load column shows booked hours as a share of capacity. Above 100% is over-allocation, the most common reason plans slip. The project table adds up hours per project, converts them to full-time equivalents and, if you entered the hours each project needs, shows the shortfall.
Worked example
With the example loaded, Asha is booked for 48 hours against 40 available, a load of 120%. Ben has 5 spare hours and Chen 4. The website needs 60 hours a week but receives only 44, a gap of 16 hours, while the mobile app is 4 hours short. Moving some of Asha’s support hours to Ben and adding a contractor to the website would close most of the gap.
Good practice
Plan people to around 80-90% so there is room for interruptions, sickness and the unexpected. Revisit the grid whenever priorities change, not only at the start of a project.
Limits
The calculator works with average weekly hours. It does not model holidays in particular weeks or skills: two people with the same free hours are not always interchangeable. Pair it with a Gantt chart when timing matters.
How to use Resource Allocation Calculator
- Add your projects and, if you know it, the hours each needs per week.
- Add each person with their available hours and their allocation to each project.
- Read the load per person and the cover per project, and rebalance until nobody is over-allocated.
Privacy: how it works
Calculations run in your browser. Nothing you type is sent anywhere.
Frequently asked questions
What does over-allocated mean?
A person is over-allocated when the hours booked for them add up to more than the hours they have. It usually leads to missed dates or overtime, so the tool flags it in red.
What is an FTE?
A full-time equivalent: the project’s weekly hours divided by one full-time week. 60 hours a week on a 40-hour basis is 1.5 FTE.
How is this different from a utilisation calculator?
Utilisation looks back at hours actually worked. Allocation looks ahead: it plans how people’s time will be split across projects before the work happens.