Milestone Planner

Keep the key dates of a project in one place. Enter each milestone with its due date and owner and tick the ones that are done. The planner puts them in order on a timeline, shows what is next and what is overdue, counts the working days between them and gives you a calendar file.

Milestone 1

Milestone 2

Working days

Dates as YYYY-MM-DD, separated by commas or new lines. No public holidays are built in.

Why milestones matter

A milestone marks a moment, not an activity: the contract is signed, the design is approved, the beta goes out, the system goes live. Milestones have no duration of their own, but they are what sponsors and clients actually ask about. A few well-chosen milestones often explain a plan better than a long task schedule.

Choosing good milestones

Pick points where something verifiable has happened, ideally with a decision or handover attached. “Design approved by the client” is a good milestone; “design 50% done” is not, because nobody can check it. Give each one an owner who will confirm it has been reached. Four to ten milestones are plenty for most projects.

Using the planner

Enter the project start, then each milestone with its due date and owner. Tick the box when a milestone is reached. The “status as of” date is today by default; change it to see how the plan looked at an earlier review or to check what will be overdue next week. Milestones are sorted by date.

What the figures mean

Days from start are calendar days. The working-day gap counts from the day after the previous milestone up to and including the milestone date, skipping your weekend and any holidays you list. That gap is a quick sanity check: if design approval and beta release are only six working days apart, the plan probably needs another look.

Worked example

Load the example after setting a start date. It adds four milestones one, three, seven and ten weeks after the start. The first is ticked as done; if the status date is past the second, it turns red as overdue and the summary says how many days late it is.

Taking it with you

The .ics download adds every milestone as an all-day event to Google Calendar, Outlook or Apple Calendar, with the owner and status in the notes. The CSV opens in any spreadsheet. Nothing is saved on the page itself, so keep the CSV if you want to update the plan later.

How to use Milestone Planner

  1. Set the project start date and the date to check status against (today by default).
  2. Add each milestone with its due date and owner, and tick the finished ones.
  3. Read the timeline and table, then download the .ics calendar file or a CSV.

Privacy: how it works

Everything happens in your browser. Your plan is not sent to any server.

Frequently asked questions

How do I add the milestones to Google Calendar or Outlook?

Download the .ics file and open it, or import it in your calendar’s settings. Each milestone becomes an all-day event with its owner and status in the description.

What is the difference between a milestone and a task?

A task takes time and effort; a milestone is a point in time that marks something finished or decided, such as design approval or go-live. Milestones have no duration.

Does it save my plan?

No. Nothing is stored or uploaded. Download the CSV to keep a copy, and paste the dates back in next time.